PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION
|更新时间:2025-09-28
|
PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION
Thermal Power GenerationVol. 38, Issue 5, Pages: 77-79(2009)
作者机构:
中广核工程有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.8
Published:2009
稿件说明:
移动端阅览
WEN Gong-qian, WANG Bo, ZHOU Peng, et al. PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION[J]. Thermal power generation, 2009, 38(5): 77-79.
DOI:
WEN Gong-qian, WANG Bo, ZHOU Peng, et al. PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION[J]. Thermal power generation, 2009, 38(5): 77-79.DOI:
PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION
摘要
某核电站凝结水处理系统投运后导致蒸汽发生器液相中SO4浓度升高
为此
分析了凝结水处理系统存在的诸多问题
如树脂混合、树脂分离及树脂扰动等。通过在混床内增加二次混合设备
采用先进的高塔分离法
设计均匀的布水装置
选用优质的离子交换树脂等措施
将使问题得到解决。
Abstract
In a nuclear power station
after the condensed water treating system was put into operation
the concentration of SO2-4 in liquid phase in the steam generator increased.For solving this problem
this paper analyzes the problems existing in the condensed water treating system
such as resin mixing
resin separating
and resin disturbing.By adding secondary mixing device in mixing bed and adopting the advanced high-tower separation method
designing well-proportioned condensate distribution device