您当前的位置:
首页 >
文章列表页 >
PROBLEMS EXISTING IN LIMESTONE CONVEYING SYSTEM OF 300 MW CFB BOILER AND RETROFIT THEREOF
更新时间:2025-09-28
    • PROBLEMS EXISTING IN LIMESTONE CONVEYING SYSTEM OF 300 MW CFB BOILER AND RETROFIT THEREOF

    • Thermal Power Generation   Vol. 38, Issue 6, Pages: 46-48(2009)
    • CLC: TK229.6
    • Published:2009

    移动端阅览

  • CHEN Jian-bin1, CHEN Hong2, JIANG Jian-zhong3, et al. PROBLEMS EXISTING IN LIMESTONE CONVEYING SYSTEM OF 300 MW CFB BOILER AND RETROFIT THEREOF[J]. Thermal power generation, 2009, 38(6): 46-48. DOI:

  •  
  •  

0

Views

117

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND COUNTER-MEASURES OF SLAG-COOLER TROUBLES OF CFB BOILERS IN DATUN GANGUE-BURNING THERMAL POWER PLANT
TECHNICAL FEATURES AND EXISTING PROBLEMS OF DG 440t/h SUPER HIGH PRESSURE REHEATED CFB BOILER
RETROFIT OF MATERIAL-RETURNING ENTRANCE AND SLAG-COOLING AIR OF COMBINED SLAG-COOLER WITH AIR AND WATER FOR CFB BOILERS
Application of generalized predictive control algorithm in selective non-catalytic reduction flue gas denitrification system
Numerical study on concentration distribution of particles in a supercritical CFB boiler furnace during circulating loop interruption

Related Author

HAN Dong-tai
WEI Rong-zhang
ZHANG Quan sheng
YIE Si
GUO Xiao-yuan1
HUANG Wei-gang1
LI Long1
DANG Xiao-jian2 1.Baode Shendong Power Generatino Co Ltd

Related Institution

China University of Mining and Technology
China University of Mining and Technology Xuzhou
Shenhuo Group Environmental Protection Demonstration Power Station
Dongfang Boiler (Group) Co., Ltd. Henan Yongcheng
0