STUDY ON THE INFLUENCE OF LOAD DEVIATION IN CONSTANT-FORCED HANGING BRACKET UPON PIPING’S THERMAL DISPLACEMENT
|更新时间:2025-09-28
|
STUDY ON THE INFLUENCE OF LOAD DEVIATION IN CONSTANT-FORCED HANGING BRACKET UPON PIPING’S THERMAL DISPLACEMENT
Thermal Power GenerationVol. 38, Issue 5, Pages: 72-76(2009)
作者机构:
1. 西安热工研究院有限公司
2. 国电长源荆门热电厂
作者简介:
基金信息:
DOI:
CLC:TK264.9
Published:2009
稿件说明:
移动端阅览
KANG Yu-jun1, YAO Jun-wu2, WANG Bi-ning1, et al. STUDY ON THE INFLUENCE OF LOAD DEVIATION IN CONSTANT-FORCED HANGING BRACKET UPON PIPING’S THERMAL DISPLACEMENT[J]. Thermal power generation, 2009, 38(5): 72-76.
DOI:
KANG Yu-jun1, YAO Jun-wu2, WANG Bi-ning1, et al. STUDY ON THE INFLUENCE OF LOAD DEVIATION IN CONSTANT-FORCED HANGING BRACKET UPON PIPING’S THERMAL DISPLACEMENT[J]. Thermal power generation, 2009, 38(5): 72-76.DOI:
STUDY ON THE INFLUENCE OF LOAD DEVIATION IN CONSTANT-FORCED HANGING BRACKET UPON PIPING’S THERMAL DISPLACEMENT
The load deviation in constant-forced hanging bracket directly affect thermal displacement of the piping system and the performance of said hanging bracket.For this
taking the main steam pipeline of a 220 MW unit in one power plant as example
the relationship between the load deviation in constant-forced hanging bracket and the thermal displacement of piping system has been calculated and analysed.Results show that the vertical thermal displacement is increasing in the event of increasing the load deviation
while the horizontal displacement having remarkable change.In order to control the stress level in the pipeline
it is recommended to select the suitable constant-forced hanging bracket during the time of design.The constant-forced hanging brackets have already been long-term in operation or those of poor quality should be timely adjusted or replaced;the pipeline of ultrasupercritical units should use constant-forced hanging bracket with high quality and little load deviation
to ensure long-term safe and reliable operation of the pipeline and the hanging bracket.