STUDY ON INSTALLATION OF ANTI-ABRASION PLATFORMS USED IN FURNACE OF CFB BOILERS AND THEIR INFLUENCE UPON HEAT TRANSFR IN THE FURNACE
|更新时间:2025-09-28
|
STUDY ON INSTALLATION OF ANTI-ABRASION PLATFORMS USED IN FURNACE OF CFB BOILERS AND THEIR INFLUENCE UPON HEAT TRANSFR IN THE FURNACE
Thermal Power GenerationVol. 38, Issue 5, Pages: 51-55(2009)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TK229.6
Published:2009
稿件说明:
移动端阅览
XIAO Ping, JIANG Min-hua, XU Zheng-quan, et al. STUDY ON INSTALLATION OF ANTI-ABRASION PLATFORMS USED IN FURNACE OF CFB BOILERS AND THEIR INFLUENCE UPON HEAT TRANSFR IN THE FURNACE[J]. Thermal power generation, 2009, 38(5): 51-55.
DOI:
XIAO Ping, JIANG Min-hua, XU Zheng-quan, et al. STUDY ON INSTALLATION OF ANTI-ABRASION PLATFORMS USED IN FURNACE OF CFB BOILERS AND THEIR INFLUENCE UPON HEAT TRANSFR IN THE FURNACE[J]. Thermal power generation, 2009, 38(5): 51-55.DOI:
STUDY ON INSTALLATION OF ANTI-ABRASION PLATFORMS USED IN FURNACE OF CFB BOILERS AND THEIR INFLUENCE UPON HEAT TRANSFR IN THE FURNACE
摘要
多阶防磨装置是一种新型CFB锅炉炉内水冷壁防磨技术
它是通过降低水冷壁贴壁灰流速度
从根本上消除或缓解水冷壁的磨损。在对多阶防磨装置防磨原理和防磨效果进行理论分析的基础上
对安装该防磨装置后对炉内传热的影响程度进行了分析计算。实际应用结果表明
安装防磨装置后
锅炉水冷壁传热系数基本没有变化
炉膛密相区平均温度升高17.1℃
不会对锅炉炉内燃烧、传热等产生实质性的影响
防磨效果显著。
Abstract
The installation of anti-abrasion platforms is a new anti-abrasion technology used in the furnace of CFB boilers
which can thoroughly eliminate or alleviate abrasion on the water-wall through decreasing the ash flow velocity closing to the water-wall.On the basis of theoritical analysis carried out for this installation of anti-abrasion platforms
and based on modelling calculation
the degree of affecting heat transfer in the furnace after using said installation has been analysed and calculated.Results show that the heat transfer coefficient of the water-wall basically hasn’t changed after using said installation
the average temperature in dense-phase region has risen 17.1 ℃
can’t produce essential influence upon combustion and heat transfer etc.in the furnace of boiler
DCS SYSTEM AND CONTROL SCHEME OF CFB BOILER FOR 135MW UNIT IN SHENHUA EVIRONMENT PROTECTION DEMONSTRATING POWER PLANT
PRELIMINARY ANALYSIS OF REQUIREMENTS TO WATER-WALL SYSTEM PERFORMANCE FOR SERVICE OPERATION OF SUPERCRITICAL PRESSURE ONCETHROUGH BOILER OF 600MW UNITS
CAUSE ANALYSIS OF PRIMARY FAN VIBRATION FOR A 130 t/h CFB BOILER
CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
Related Author
YIN Ji hu
XIE Jiang
YAN Zhaoping
YOU Wenjie
ZHAO Hongyan
ZHANG Guo-bing
LI Hu
LIANG Gui-long
Related Institution
Shenhuo Group Environmental Protection Demonstration Power Station, Yongcheng
Guangdong Electric Honghai Bay Power Generation Co., Ltd.