APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT
|更新时间:2025-09-28
|
APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT
Thermal Power GenerationVol. 38, Issue 7, Pages: 88-91(2009)
作者机构:
1. 郑州电力高等专科学校动力工程系
2. 华润电力登封有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.2
Published:2009
稿件说明:
移动端阅览
LI xian-zhong1, Wang Guo-kun2, XUE Zhao-wei21.Department of Power Engineering. APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT[J]. Thermal power generation, 2009, 38(7): 88-91.
DOI:
LI xian-zhong1, Wang Guo-kun2, XUE Zhao-wei21.Department of Power Engineering. APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT[J]. Thermal power generation, 2009, 38(7): 88-91.DOI:
APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT
The application of ABB UVISOR flame detecting system on boilers of 2×300 MW units in Henan Huarun Dengfeng Power Plant has been presented.Directing against the problems occurred in boiler operation
such as slagging on burners affecting the line of vision from flame-detecting probe
decreasing volatile content in fuel coal and low temperature of the primary air leading to lengthening the black zone of combustion etc.
an optimization debugging has been carriedout for this flame detecting system.The optimization debugging shows that the said flame detecting system can more excellently satisfy the requirements in operation
if the automatic optimizing function of four-set parameters in MFD can be used
introducing the function of automatically calling different parameters into the system according to different loads.