您当前的位置:
首页 >
文章列表页 >
DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS
更新时间:2025-09-28
    • DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS

    • Thermal Power Generation   Vol. 38, Issue 5, Pages: 88-90(2009)
    • CLC: TM621
    • Published:2009

    移动端阅览

  • LUO Jian-ke Weihe Power Generation Co Ltd. DESIGN AND OPERATION OF AGC FUNCTION FOR 300 MW UNITS[J]. Thermal power generation, 2009, 38(5): 88-90. DOI:

  •  
  •  

0

Views

71

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization on coordinated control system of supercritical unit in Huaneng Shanghai Shidongkou Second Power Plant
Simulation modelling of power system for supercritical units considering dynamic heat exchange of once-through boiler
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
CAUSE ANALYSIS AND CONTROL MEASURES OF UNSTABLE VIBRATION IN SHAFTING SYSTEM OF 300 MW TURBO-GENERATOR
CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF

Related Author

ZHAO Zhidan
GU Tao
CHEN Zhigang
XI Chengchao
GUO Jianhui
YU Jing
XU Darui
HAO Ling

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Shanghai Shidongkou Second Power Plant
Department of Electrical Engineering and Applied Electronic Technology, Tsinghua University
National Key Laboratory of New Power System Operation and Control, Tsinghua University
State Grid Ningxia Electric Power Co., Ltd
0