您当前的位置:
首页 >
文章列表页 >
SHAFTING VIBRATION ANALYSIS AND OPTIMIZATION FOR A 135 MW TURBOGENERATOR UNIT
更新时间:2025-09-28
    • SHAFTING VIBRATION ANALYSIS AND OPTIMIZATION FOR A 135 MW TURBOGENERATOR UNIT

    • Thermal Power Generation   Vol. 38, Issue 4, Pages: 58-60(2009)
    • CLC: TM311
    • Published:2009

    移动端阅览

  • SONG Bin, XI Zhu-zui, YUAN Li-bo 1.Shandong Electric Research Power Institute. SHAFTING VIBRATION ANALYSIS AND OPTIMIZATION FOR A 135 MW TURBOGENERATOR UNIT[J]. Thermal power generation, 2009, 38(4): 58-60. DOI:

  •  
  •  

0

Views

74

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

RETROFIT OF GLAND-PACKING FOR 300MW STEAM TURBINE IN HUAYANG POWER-GENERATION COMPANY
ANALYSIS OF FREQUENT VIBRATION FOR A 50MW UNIT
ANALYSIS AND TREATMENT OF VIBRATION FOR TURBOGENERATOR UNITS DURING TRIAL OPERATION
ANALYSIS AND TREATMENT OF VIBRATION FOR 600 MW TURBOGENERATOR UNIT MADE IN CHINA
Shaft vibration in a 200MW unit:reason analysis and countermeasures

Related Author

YANG Zhi-feng
ZHANG Weijun
WANG Xin-yu North United Electric Power Co.
SHI Jian-liang
LI De-yong31.Xi'an Thermal Power Research Institute Co Ltd
SHI Jian-liang2
ZHANG Xue-yan1
HE Guoan

Related Institution

Huayang Power Generation Co., Ltd.
Xi'an Thermal Power Research Institute Co., Ltd
Northern United Power Co., Ltd
Huaneng Yimin Coal and Electricity Co., Ltd
School of Mechanical Engineering, Xi'an Petroleum University
0