您当前的位置:
首页 >
文章列表页 >
STUDY ON OPTIMIZED DESIGN OF STRUCTURAL PARAMETERS FOR GYPSUM DEWATERING HYDRO-CYCLONE
更新时间:2025-09-28
    • STUDY ON OPTIMIZED DESIGN OF STRUCTURAL PARAMETERS FOR GYPSUM DEWATERING HYDRO-CYCLONE

    • Thermal Power Generation   Vol. 38, Issue 5, Pages: 25-28(2009)
    • CLC: TM621.8
    • Published:2009

    移动端阅览

  • HUANG Jun1, AN Lian-suo1, WU Zhi-quan21.Key Laboratory of State Monitoring and Control for Power Station Equipments under Educational Ministry. STUDY ON OPTIMIZED DESIGN OF STRUCTURAL PARAMETERS FOR GYPSUM DEWATERING HYDRO-CYCLONE[J]. Thermal power generation, 2009, 38(5): 25-28. DOI:

  •  
  •  

0

Views

156

下载量

14

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

EXISTING PROBLEMS IN DESULFURATION SYSTEM FOR BURNING HIGH SULFER COAL AND SOLUTION MEASURES THEREOF
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Ultra-low emission reform and its influence on the plant’s electricity supply cost
Mercury removal technology for coal-fired flue gas: research progress

Related Author

闫军
何育东
WANG Lin
GAO Jihui
CHE Hongwei
JING Xinjing
LI Yang
LUO Zhi

Related Institution

Chongqing Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
School of Energy Science and Engineering, Harbin Institute of Technology
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guoneng (Shendong Power) Group
0