CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF
更新时间:2025-09-28
    • CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF

    • Thermal Power Generation   Vol. 38, Issue 7, Pages: 62-63(2009)
    • CLC: TK223.7
    • Published:2009

    移动端阅览

  • CHEN Xing, LI Hong-pingXinyang Huayu Power Generation Co Ltd. CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF[J]. Thermal power generation, 2009, 38(7): 62-63. DOI:

  •  
  •  

0

Views

109

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF VIBRATION PROBLEM FOR HOME - MADE 600 MW SUPERCRITICAL TURBO - GENERATOR SET AND TREATMENT THEREOF
FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET
ANALYSIS OF OPERATING STATUS FOR HOME-MADE SUPERCRITICAL 600MW UNITS
CAUSE ANALYSIS OF SPACING TUBE BURST ON PLATEN SUPERHEATER OF ONE SUPERCRITICAL BOILER AND COUNTERMEASURES THEREOF

Related Author

张学延
张卫军
周亮
钮宾
王延博
葛祥
陈国军
曲志中

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Qinbei Power Generation Co., Ltd
Pingwei Second Power Generation Co., Ltd
Beizhong Alstom (Beijing) Electrical Equipment Co., Ltd
Jiangsu Electric Power Test and Research Institute Co., Ltd
0