COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS
|更新时间:2025-09-28
|
COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS
Thermal Power GenerationVol. 38, Issue 7, Pages: 14-17(2009)
作者机构:
山东电力研究院
作者简介:
基金信息:
DOI:
CLC:TK323
Published:2009
稿件说明:
移动端阅览
LI Hua-dongShandong Provincial Electric Power Research Institute. COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS[J]. Thermal power generation, 2009, 38(7): 14-17.
DOI:
LI Hua-dongShandong Provincial Electric Power Research Institute. COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS[J]. Thermal power generation, 2009, 38(7): 14-17.DOI:
COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS
The reliability of run back(RB) function has important signigicance for preventing abnormal shutdown of the units and for enhancing stability of the power grid.Based on the RB control strategy of the subcritical units
directing against the operation characters of supercritical units
the identical and exceptional points in RB control strategy of supercritical and subcritical units have been expounded.In the case of RB on subcritical unit
false water level in the drum can't appear under variation velocity of the main steam pressure≤1 MPa/min
but
in the event of RB on supercritical unit
the set value for velocity of load reduction of the main steam pressure is greater than that of subcritical unit.