您当前的位置:
首页 >
文章列表页 >
AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER
更新时间:2025-09-28
    • AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER

    • Thermal Power Generation   Vol. 38, Issue 5, Pages: 56-58(2009)
    • CLC: TK223.34
    • Published:2009

    移动端阅览

  • ZOU Hai-feng1, LI Ying21.School of Business Administration. AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER[J]. Thermal power generation, 2009, 38(5): 56-58. DOI:

  •  
  •  

0

Views

115

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT
燃煤锅炉排烟温度高的原因分析及运行中可采取的措施
THE PATTERN RECOGNITION OF AIR LEAKAGE INTO BOILERS BASED ON SELF ORGANIZING CHARACTOR REFLECTING NETWORK
ANALYSIS OF AND STUDY ON RETROFIT AND APPLICATION RESULT OF ECONOMIZER IN THERMAL POWER PLANT
CAUSE ANALYSIS OF ASH CLOGGING IN REGENERATIVE AIR HEATER AND PREVENTIVE MEASURES THEREOF

Related Author

LI Jian-hong Huaneng Yushe Power Plant
王永成
唐世蔼
CHEN Hong
HE Zu wei
GOU Xiao long et al
张子敬
王清华

Related Institution

Huaneng Yushe Power Plant
Luohe Power Plant
Luohe Power Plant Anhui Huainan
安徽淮南232008
Chongqing University
0