您当前的位置:
首页 >
文章列表页 >
INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT
更新时间:2025-09-28
    • INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT

    • Thermal Power Generation   Vol. 38, Issue 6, Pages: 56-57(2009)
    • CLC: TK223.34
    • Published:2009

    移动端阅览

  • LI Jian-hong Huaneng Yushe Power Plant. INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT[J]. Thermal power generation, 2009, 38(6): 56-57. DOI:

  •  
  •  

0

Views

97

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER
BENDING ROTOR'S VIBRATION CONTROL OF STEAM TURBINE FOR A 300MW UNIT
RETROFITTING AIR PREHEATER OF BOILER TO ADOPT CONTACTING TYPE FLEXIBLE SEAL
A rotor fault diagnosis method based on EEMD cloud model and SVM
燃煤锅炉排烟温度高的原因分析及运行中可采取的措施

Related Author

ZOU Hai-feng1
LI Ying21.School of Business Administration
袁立平
罗剑斌
李力
谭士森
XI Guang-hui
ZHANG JunDatang Xutang Power Generation Co Ltd

Related Institution

School of Business Administration, North China Electric Power University
Shenhua Guohua (Beijing) Electric Power Research Institute
Henan Electric Power Test and Research Institute
Henan Electric Power Test and Research Institute Zhengzhou
0