您当前的位置:
首页 >
文章列表页 >
COUNTERMEASURES FOR MAIN STEAM OVERTEMPERATURE OF 600 MW SUPERCRITICAL UNIT DURING TURBINE SPEED-UP
更新时间:2025-09-28
    • COUNTERMEASURES FOR MAIN STEAM OVERTEMPERATURE OF 600 MW SUPERCRITICAL UNIT DURING TURBINE SPEED-UP

    • Thermal Power Generation   Vol. 38, Issue 5, Pages: 42-44(2009)
    • CLC: TK229.2
    • Published:2009

    移动端阅览

  • HUANG Wei, ZHANG Jian-ling, PENG Min, et al. COUNTERMEASURES FOR MAIN STEAM OVERTEMPERATURE OF 600 MW SUPERCRITICAL UNIT DURING TURBINE SPEED-UP[J]. Thermal power generation, 2009, 38(5): 42-44. DOI:

  •  
  •  

0

Views

135

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

FEED-WATER REGULATION OF SUPERCRITICAL BOILERS
CONTROL OF MAIN STEAM TEMPERATURE FOR SUPERCRITICAL 600 MW UNIT EQUIPED WITH DOUBLE-INLET AND DOUBLE-OUTLET COAL PULVERIZER
Optimization and fixed value disturbance test analysis for coordination control system of a supercritical 660 MW unit
Optimization of load control strategy for a supercritical 600MW unit boiler
ESTABLISHMENT AND ANALYSIS OF DYNAMIC MATHEMATICAL MODEL FOR EMULATION SYSTEM OF SUPERCRITICAL 600 MW ONCE-THROUGH BOILER UNIT

Related Author

MA Kai-zhong Yangzhou Power Generation Co Ltd No.2
ZHAO Zhi-dan1
CHEN Zhi-gang1
WANG Kai-zhu2
HAO De-feng1
LIAN Ling-xian2
WANG Yong21.Xi'an Thermal Power Research Institute Co Ltd
WANG Yinsong

Related Institution

Yangzhou Second Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Qinbei Power Generation Co., Ltd
Hebei Engineering Research Center of Simulation & Optimized Control for Power Generation,North China Electric Power University
Control Technology Department,Zhejiang Energy Group R&D
0