WU You-bingShenhua Yili Energy Co Ltd. CAUSE ANALYSIS ABOUT OVERTEMPERATURE OF RETURN OIL FROM HYDRAULIC COUPLING OF I.D.FANS[J]. Thermal power generation, 2009, 38(8): 86-88.
DOI:
WU You-bingShenhua Yili Energy Co Ltd. CAUSE ANALYSIS ABOUT OVERTEMPERATURE OF RETURN OIL FROM HYDRAULIC COUPLING OF I.D.FANS[J]. Thermal power generation, 2009, 38(8): 86-88.DOI:
CAUSE ANALYSIS ABOUT OVERTEMPERATURE OF RETURN OIL FROM HYDRAULIC COUPLING OF I.D.FANS
The causes leading to overtemperature of return oil from hydraulic coupling of I.D.fans in the debugging process of CFB boilers for 4×200 MW units have been analysed.It is believed that the main causes resulting in overtemperature of return oil from hydraulic coupling of I.D.fans are unproper installation of mechanical parts at inlet of I.D.fans and impefect regulating mode of said fans
making load and shaft power of them to be increased.The scheme of solution has been put forward as follows:(1)adjusting the rotating direction of baffle plates at the force-bearing end of I.D.fans
and adjusting the open degree of baffle plates at inlet of said fans;(2)on the basis of existing oil system of hydraulic coupling
additionally installng auxiliary oil pump;(3)improving the debugging mode in start-up of the I.D.fans.After implementation of above-mentioned scheme
the overtemperature problem of return oil from the hydraulic coupling has been solved.
Flue gas recirculation scheme for double-reheat boilers
ANALYSIS OF A BURNINEG ACCIDENT IN CONSTRUCTION DEBUGGING FOR ONE UTILITY BOILER AND PREVENTING MEASURES THEREOF
TEST AND ANALYSIS ABOUT INFLUENCE OF FOULING UPON OPERATION OF 350 MW UNIT
AN APPROACH TO PROBLEM OF SCRAMBLING FOR AIR OF AXIAL I. D. FANS WITH STATIONARY BLADE ADJUSTMENT
OPERATIONAL CHARACTORS OF BOILERS EQUIPPED FOR ULTRA-SUPERCRITICAL 660 MW UNIT AFTER COMBINING THE BOOSTER AIR FAN IN DESULPHURIZATION SYSTEM AND THE INDUCED DRAFT FAN INTO ONE