您当前的位置:
首页 >
文章列表页 >
RETROFIT FOR OPTIMIZING ALLOCATION OF TURBINE'S SUPERVISORY INSTRUMENTS AND TRANSIENT DATA MANAGEMENT SYSTEM
更新时间:2025-09-28
    • RETROFIT FOR OPTIMIZING ALLOCATION OF TURBINE'S SUPERVISORY INSTRUMENTS AND TRANSIENT DATA MANAGEMENT SYSTEM

    • Thermal Power Generation   Vol. 38, Issue 8, Pages: 125-126(2009)
    • CLC: TM621.3
    • Published:2009

    移动端阅览

  • BAI Yue-mei1, WANG Hao-sen2, WANG Hao31.Huaneng Qinling Power Generation Co Ltd. RETROFIT FOR OPTIMIZING ALLOCATION OF TURBINE'S SUPERVISORY INSTRUMENTS AND TRANSIENT DATA MANAGEMENT SYSTEM[J]. Thermal power generation, 2009, 38(8): 125-126. DOI:

  •  
  •  

0

Views

49

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPARISON OF STRUCTURAL DESIGN FOR THREE 1000 MW STEAM TURBINES
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT

Related Author

ZHU Bao-tianXi'an Thermal Power Research Institute Co Ltd
LUO Juan
HU Niansu
QI Haitao
WANG Zhijun
WANG Chenyu
SU Tongchun
LIU Hong

Related Institution

Wuhan University
Zhangze Power Plant
Zhangze Power Plant Shanxi Changzhi
Harbin Power Station Engineering Co., Ltd
0