您当前的位置:
首页 >
文章列表页 >
MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT
更新时间:2025-09-28
    • MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT

    • Thermal Power Generation   Vol. 38, Issue 9, Pages: 89-91(2009)
    • CLC: TK268
    • Published:2009

    移动端阅览

  • LI Fang-ji, DENG Xu-dong Shenzhen Guangqian Electric Power Co Ltd. MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT[J]. Thermal power generation, 2009, 38(9): 89-91. DOI:

  •  
  •  

0

Views

147

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reliability state identification for key auxiliary equipments in thermal power units
Difficulties and countermeasures of quality control in wind turbine blades
Reliability assessment of distributed energy system
APPLICATION OF RELIABILITY-CENTERED MAINTENANCE TECHNOLOGY ON STEAM TURBINE AND IT'S AUXILIARY EQUIPMENT SYSTEM
STATUS INSPECTION AND SERVICE LIFE ASSESSMENT OF WELDED JOINTS BETWEED TP304H / SA213T22 STEELS OF DIFFERENT SORT

Related Author

BAI Ling
WANG Jiebin
WANG Bingjia
ZHAO Yong
CAI Qiang
QIU Liuliang
WU Qiong
REN Hongbo

Related Institution

Guohua Electric Power Branch, China Shenhua Energy Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
College of Energy and Mechanical Engineering, Shanghai University of Electric Power
内蒙呼和浩特
0