您当前的位置:
首页 >
文章列表页 >
TYPICAL CONTROL PROBLEMS ENCOUNTERED IN COMMISSIONING TEST OF FOSSILFIRED POWER GENERATING UNITS AND THEIR SOLUTIONS
更新时间:2025-09-28
    • TYPICAL CONTROL PROBLEMS ENCOUNTERED IN COMMISSIONING TEST OF FOSSILFIRED POWER GENERATING UNITS AND THEIR SOLUTIONS

    • Thermal Power Generation   Vol. 38, Issue 8, Pages: 115-117(2009)
    • CLC: TK36
    • Published:2009

    移动端阅览

  • LI xian-zhong1, Wang Guo-kun2, Yang Jian-hua11.Zhengzhou Electric Power College. TYPICAL CONTROL PROBLEMS ENCOUNTERED IN COMMISSIONING TEST OF FOSSILFIRED POWER GENERATING UNITS AND THEIR SOLUTIONS[J]. Thermal power generation, 2009, 38(8): 115-117. DOI:

  •  
  •  

0

Views

51

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Configuration normalization of fieldbus device for thermal plants
Fieldbus commissioning method and problem handling for coal-fired power plants
Control system design for test platform of key components in 700 ℃ ultra supercritical power units
Research on control system of voltage stabilizer pressure and liquid level in nuclear power station
Linear auto disturbance rejection control system for water level in drum

Related Author

LI Xiaobo
LIU Xi
TAN Xiangshuai
CHEN Kun
GAO Kui
SUN Yangyang
YAO Guopeng
ZHONG Yiqing

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
China Huaneng Clean Energy Research Institute Co., Ltd.
School of Electric Power, South China University of Technology
Guangdong Province Key Laboratory of Efficient and Clean Energy Utilization
School of Control and Computer Engineering, North China Electric Power University
0