您当前的位置:
首页 >
文章列表页 >
AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT
更新时间:2025-09-28
    • AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT

    • Thermal Power Generation   Vol. 38, Issue 11, Pages: 81-83(2009)
    • CLC: TK229.54
    • Published:2009

    移动端阅览

  • LIU Ming-yuan, LIN Feng, WU Quan, et al. AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT[J]. Thermal power generation, 2009, 38(11): 81-83. DOI:

  •  
  •  

0

Views

55

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TRIAL OPERATION OF BOILER STARTINGUP FOR 600 MW SUPERCRITICAL UNIT IN QINBEI POWER PLANT
CAUSE ANALYSIS AND PREVENTIVE MEASURES OF OUTFIRE IN W-SHAPED FLAME BOILER FOR 600 MW UNIT
ANALYSIS OF OVER-TEMPERATURE ON THE PLATEN SUPERHEATER OF ONCE-THROUGH BOILER FOR SUPERCRITICAL 600 MW UNIT
QUANTITATIVE ASSESSMENT OF FAILURE RISK FOR HIGH TEMPERATURE HEADER MADE FROM P91 STEEL
SEVERAL PROBLEMS EXISTING IN OPERATION OF SUPERCRITICAL AND ULTRA-SUPERCRITICAL BOILERS

Related Author

QIN Chao-hui1
LI Xue-Zhong21.Nantong Power Plant under Huaneng International Electric Power Co Ltd
WANG Xi-huan
XIA Xiao-dong
ZHOU Zi-minDatang Huayin Jinzhushan Thermal Power Generation Branch Company
HAN BoYuedian Jinghai Power Generation Co Ltd
XUE Hanguang
LI Yaojun

Related Institution

Huaneng Nantong Power Plant
Huaneng Qinbei Power Plant
Datang Huayin Jinzhushan Thermal Power Generation Branch
Yuedian Jinghai Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
0