您当前的位置:
首页 >
文章列表页 >
OPTIMIZED RETROFIT OF WARMING-UP FOR FEED-WATER PUMPS OF 200 MW UNITS
更新时间:2025-09-28
    • OPTIMIZED RETROFIT OF WARMING-UP FOR FEED-WATER PUMPS OF 200 MW UNITS

    • Thermal Power Generation   Vol. 38, Issue 12, Pages: 73-74(2009)
    • CLC: TM621
    • Published:2009

    移动端阅览

  • ZHANG Zheng-feng, HUANG Xiao-jun, REN Zhan-hong Huaneng Shaanxi Qinling Power Generation Co Ltd. OPTIMIZED RETROFIT OF WARMING-UP FOR FEED-WATER PUMPS OF 200 MW UNITS[J]. Thermal power generation, 2009, 38(12): 73-74. DOI:

  •  
  •  

0

Views

52

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF AN ACCIDENT CONCERNING SERIOUS EMULSIFICATION OF THE TURBINE OIL
CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF
CAUSES ANALYSIS OF BIG TEMPERATURE DIFFERENCE BTWEEN CASINGS OF UNIT NO.9 IN SHAOGUAN POWER PLANT AND TREATMENT THEREOF
CAPACITY-INCREASING RETROFIT OF 2DG-10J TYPE FEED-WATER PUMP IN ONE THERMAL POWER PLANT
ANALYSIS OF ECONOMIC OPERATION AND IMPROVEMENT OF MOTOR-DRIVEN FEED-WATER PUMP PROVIDED WITH HYDRAULIC COUPLING

Related Author

WU Sanmao
WU Ping
HE Dongrong
SONG Wen-xi
HE Jian-kang
ZHENG Cai-ping
BUN Guo-qiang
YUK Yong

Related Institution

Jiangxi Electric Power Test and Research Institute
Shaoguan Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Jiangsu Special Equipment Safety Supervision and Inspection Research Institute Changzhou Branch
Changzhou Yanang Thermal Power Co., Ltd
0