CAUSE ANALYSIS OF TUBE BREAKAGE IN HEAT EXCHANGER OF CLOSED-LOOP COOLING WATER AND RETROFIT THEREOF
|更新时间:2025-09-28
|
CAUSE ANALYSIS OF TUBE BREAKAGE IN HEAT EXCHANGER OF CLOSED-LOOP COOLING WATER AND RETROFIT THEREOF
Thermal Power GenerationVol. 38, Issue 10, Pages: 50-54(2009)
作者机构:
1. 华能广东分公司
2. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.3
Published:2009
稿件说明:
移动端阅览
KUANG Zhong-he1, TIAN Tian2 1.Huaneng Guangdong Branch Company. CAUSE ANALYSIS OF TUBE BREAKAGE IN HEAT EXCHANGER OF CLOSED-LOOP COOLING WATER AND RETROFIT THEREOF[J]. Thermal power generation, 2009, 38(10): 50-54.
DOI:
KUANG Zhong-he1, TIAN Tian2 1.Huaneng Guangdong Branch Company. CAUSE ANALYSIS OF TUBE BREAKAGE IN HEAT EXCHANGER OF CLOSED-LOOP COOLING WATER AND RETROFIT THEREOF[J]. Thermal power generation, 2009, 38(10): 50-54.DOI:
CAUSE ANALYSIS OF TUBE BREAKAGE IN HEAT EXCHANGER OF CLOSED-LOOP COOLING WATER AND RETROFIT THEREOF
The causes of tube breakage in operation of the Russian made baffle plate tubular heat exchanger for closed-loop cooling water in Huaneng Shantou Power Plant have been analysed.It is believed that the main cause resulted in tube breakage in said heat exchanger is the vibration of tubes in the heat exchanger due to the horizontal flow speed of closed-loop cooling water at inlet and outlet of the heat-exchanger being larger than the critical speed.The retrofit measures
such as adopting baffle rod tubular heat exchanger
reducing the horizontal flow speed of closed-loop cooling water
etc.
have been put forward.After retrofitting according to said measures
the troubles of tube vibration and breakage in the heat exchanger have been eliminated
and the problem of insufficient area of the heat exchanger being solved.Through long-term application of the baffle rod tubular heat exchanger