您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF AFFECTING FACTORS UPON ENERGY CONSUMPTION OF HOME-MADE 300MW UNITS
更新时间:2025-09-28
    • ANALYSIS OF AFFECTING FACTORS UPON ENERGY CONSUMPTION OF HOME-MADE 300MW UNITS

    • Thermal Power Generation   Vol. 39, Issue 4, Pages: 1-3(2010)
    • CLC: TM621
    • Published:2010

    移动端阅览

  • LI Qingyi College of Economy. ANALYSIS OF AFFECTING FACTORS UPON ENERGY CONSUMPTION OF HOME-MADE 300MW UNITS[J]. Thermal power generation, 2010, 39(4): 1-3. DOI:

  •  
  •  

0

Views

189

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ENERGY-SAVING RETROFIT OF THE CONDASATE SYSTEM FOR HOME-MADE 300MW UNITS AND ECONOMIC EFFICIENY ANALYSIS THEREOF
CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF
APPLICATION OF DOUBLE-STRENGTENING PULVERIZED COAL OIL-MINIMUM IGNITOR ON LEAN-COAL BURNING BOILER OF 600 MW UNIT
FREQUENCY CONVERSION RETROFIT AND ENERGY-SAVING OF CONDENSATE PUMP IN HUAYU POWER PLANT
STUDY ON AND DESIGN OF RESIDUAL HEAL UTILIZATION SYSTEM FOR FLUE GAS IN THERMAL POWER PLANTS

Related Author

LI Kewen
WANG XinGuodian Jianbi Power Plant
WANG Cheng-liang Laicheng Power Plant
LU Bin21.Guodian Longshan Power Generation Co Ltd
ZHAO Yong-sheng2
REN Guo-hong2
HUANG Guo-qiang1
XIONG Kang-jun Datang Huayu Power Generation Co Ltd

Related Institution

Guodian Jianbi Power Plant
Laicheng Power Plant
Xuzhou Combustion Control Research Institute Co., Ltd
Guodian Longshan Power Generation Co., Ltd
Datang Huayu Power Generation Co., Ltd
0