CAUSE ANALYSIS OF ABNORMAL WATER-LEVEL IN AIR-COOLED ONDENSER OF 600 MW DIRECT AIR-COOLED UNIT AND DISPOSAL THEREOF
|更新时间:2025-09-28
|
CAUSE ANALYSIS OF ABNORMAL WATER-LEVEL IN AIR-COOLED ONDENSER OF 600 MW DIRECT AIR-COOLED UNIT AND DISPOSAL THEREOF
Thermal Power GenerationVol. 39, Issue 5, Pages: 96-97(2010)
作者机构:
华北电力科学研究院西安有限责任公司
作者简介:
基金信息:
DOI:
CLC:TM621.3
Published:2010
稿件说明:
移动端阅览
ZHOU Bin North China Electric Power Science Research Institute Xi’an Co Ltd. CAUSE ANALYSIS OF ABNORMAL WATER-LEVEL IN AIR-COOLED ONDENSER OF 600 MW DIRECT AIR-COOLED UNIT AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(5): 96-97.
DOI:
ZHOU Bin North China Electric Power Science Research Institute Xi’an Co Ltd. CAUSE ANALYSIS OF ABNORMAL WATER-LEVEL IN AIR-COOLED ONDENSER OF 600 MW DIRECT AIR-COOLED UNIT AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(5): 96-97.DOI:
CAUSE ANALYSIS OF ABNORMAL WATER-LEVEL IN AIR-COOLED ONDENSER OF 600 MW DIRECT AIR-COOLED UNIT AND DISPOSAL THEREOF
摘要
内蒙古京隆发电有限责任公司600MW直接空冷机组在首次整套起动过程中
其干式冷却系统的A、B两侧空气凝汽器热井水位以及两排汽管的压力(排汽压力或背压)存在过大偏差
导致凝结水泵跳闸
机组被迫停机。分析认为
故障是由于进入A、B两侧疏水扩容器的疏水在二次扩容降压时产生不同压差所致。对此
提出了在A、B空气凝汽器热井上部加装平衡管等处理措施
实施后两热井水位恢复正常。
Abstract
In the first time start-up process of complete set 600 MW direct air-cooled unit in Inner Mongolian Jinglong Power Generation Co Ltd
over-sized deviation of water-level appeared in hot-wells at A and B side of the air-cooled condenser
and over-sized deviation of steam pressure occurred in two exhaust steam pipes
leading to trip of the condensate pump
making the unit unable in normal operation
and being forced to shutdown.It is believed from analysis that the main cause leading to said troubles is the pressure difference resulted from flashing and pressure-reducing of two times during the time of drain entering into the drain flash tanks at A and B side is different
and disposal measures
such as adding balance pipe in upper part of A and B hot-well etc.