您当前的位置:
首页 >
文章列表页 >
SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS
更新时间:2025-09-28
    • SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS

    • Thermal Power Generation   Vol. 38, Issue 12, Pages: 1-4(2009)
    • CLC: TM611.3
    • Published:2009

    移动端阅览

  • YE Shan-pei1, YAO Xiao-lin2, SHI Yan-zhou21.Shenzhen Guangqian Electric Power Co Ltd. SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS[J]. Thermal power generation, 2009, 38(12): 1-4. DOI:

  •  
  •  

0

Views

75

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF Simatic PCS7 DISTRIBUTED CONTROL SYSTEM ON GAS & STEAM TURBINE COMBINED CYCLE GENERATING UNIT
Influence of steam extraction for heating on HRSG steam parameter
Optimization of Fresnel solar and gas-steam combined cycle hybrid power generation system
State stability determination of gas-steam combined cycle unit based on sample entropy
Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics

Related Author

曾卫东
张伟
薛建中
何新
景效国
WANG Lihong
ZHANG Yanchun
ZHOU Ligang

Related Institution

Guodian Thermal Power Research Institute
MHPS Dongfang Boiler Co,.LTD
Huaneng Clean Energy Research Institute
Datang Suzhou Thermal Power Co.,Ltd.,Wujiang
0