SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS
|更新时间:2025-09-28
|
SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS
Thermal Power GenerationVol. 38, Issue 12, Pages: 1-4(2009)
作者机构:
1. 深圳市广前电力有限公司
2. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM611.3
Published:2009
稿件说明:
移动端阅览
YE Shan-pei1, YAO Xiao-lin2, SHI Yan-zhou21.Shenzhen Guangqian Electric Power Co Ltd. SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS[J]. Thermal power generation, 2009, 38(12): 1-4.
DOI:
YE Shan-pei1, YAO Xiao-lin2, SHI Yan-zhou21.Shenzhen Guangqian Electric Power Co Ltd. SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS[J]. Thermal power generation, 2009, 38(12): 1-4.DOI:
SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS