AN APPROACH TO WARM-UP EFFETIVENESS OF STEAM TURBINE EQUIPPED FOR 300 MW CFB UNIT
|更新时间:2025-09-28
|
AN APPROACH TO WARM-UP EFFETIVENESS OF STEAM TURBINE EQUIPPED FOR 300 MW CFB UNIT
Thermal Power GenerationVol. 39, Issue 3, Pages: 78-81(2010)
作者机构:
大唐红河发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK267;TK229.6
Published:2010
稿件说明:
移动端阅览
DING Yong-fuDatang Honghe Power Generation Co Ltd. AN APPROACH TO WARM-UP EFFETIVENESS OF STEAM TURBINE EQUIPPED FOR 300 MW CFB UNIT[J]. Thermal power generation, 2010, 39(3): 78-81.
DOI:
DING Yong-fuDatang Honghe Power Generation Co Ltd. AN APPROACH TO WARM-UP EFFETIVENESS OF STEAM TURBINE EQUIPPED FOR 300 MW CFB UNIT[J]. Thermal power generation, 2010, 39(3): 78-81.DOI:
AN APPROACH TO WARM-UP EFFETIVENESS OF STEAM TURBINE EQUIPPED FOR 300 MW CFB UNIT
Directing against problems encountered in the process of cold-state start-up of boiler and medium speed warm-up of the steam turbine for the first 300 MW CFB unit manufactured in China
such as the temperature of main reheated steam is unable to be risen
the main steam pressure being abnormally enhanced
superheat degree being lowered
and the effectiveness of steam turbine warm-up being unable to be ensured etc.
analysis has been carried out from two aspects
i.e.operation adjustment in initial period of boiler start-up
and operation control of the steam turbine
respectively
and corresponding solving methods being put forward.After implementation
good effectiveness of warm-up for steam turbine has been obtained.