AUTOMATIC PLANT START-UP/SHUTDOWN SYSTEM(APS) OF ULTRA-SUPERCRITICAL 1000 MW UNTIS
更新时间:2025-09-28
    • AUTOMATIC PLANT START-UP/SHUTDOWN SYSTEM(APS) OF ULTRA-SUPERCRITICAL 1000 MW UNTIS

    • Thermal Power Generation   Vol. 39, Issue 3, Pages: 101-103(2010)
    • CLC: TM621
    • Published:2010

    移动端阅览

  • LI Yi-jie, SUN Ye-zhu, YANG Lüe, et al. AUTOMATIC PLANT START-UP/SHUTDOWN SYSTEM(APS) OF ULTRA-SUPERCRITICAL 1000 MW UNTIS[J]. Thermal power generation, 2010, 39(3): 101-103. DOI:

  •  
  •  

0

Views

221

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPARISON OF STRUCTURAL DESIGN FOR THREE 1000 MW STEAM TURBINES
OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT
STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT
STUDY ON THE CONTROL MODEL OF INTERMEDIARY POINT TEMPERATURE IN BOILER OF ULTRA-SUPERCRITICAL UNIT BASED ON DYNAMIC MECHANISM ANALYSIS
COMPARISON OF STEAM DISTRIBUTION MODES FOR ULTRA-SUPERCRITICAL 1 000 MW UNITS

Related Author

ZHU Bao-tianXi'an Thermal Power Research Institute Co Ltd
WANG HuiGuohua Zheneng Power Generation Co Ltd
WU Yong-cun
GAO Jin-yao
ZHU Jie-nan
ZHU Jiang-tao
WANG Baohua2
LIU Jiayu1

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Guohua Zhejiang Energy Generation Co., Ltd
Guodian Taizhou Power Generation Co., Ltd
Guangdong Power Grid Corporation Electric Power Science Research Institute
Department of Automation, Wuhan University
0