您当前的位置:
首页 >
文章列表页 >
APPLICATION OF LOAD-PREESTIMATING SIGNAL IN THE COORDINATED CONTROL SYSTEM OF UNITS
更新时间:2025-09-28
    • APPLICATION OF LOAD-PREESTIMATING SIGNAL IN THE COORDINATED CONTROL SYSTEM OF UNITS

    • Thermal Power Generation   Vol. 39, Issue 6, Pages: 53-55(2010)
    • CLC: TK323
    • Published:2010

    移动端阅览

  • LI Chengming, SONG Zhiqiang, CHENG Junjun Huaneng Tongchuan Power Plant. APPLICATION OF LOAD-PREESTIMATING SIGNAL IN THE COORDINATED CONTROL SYSTEM OF UNITS[J]. Thermal power generation, 2010, 39(6): 53-55. DOI:

  •  
  •  

0

Views

80

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF LVDT FAILURE FOR GOVENOR VALVE OF STEAM TURBINE EQUIPPED FOR SUBCRITICAL 600 MW UNIT AND RETROFIT THEREOF
Selection of steam-driven induced draft fan considering piping thermal efficiency
Simulation study on coordinated control system of subcritical 600 MW unit
ANALYSIS OF “UNSYMMETRIC BURNING” PROBLEM IN A W-SHAPED FLAME BOILER OF 600 MW UNIT
AN APPROACH TO FEASIBILITY AND ECONOMIC BEHAVIOR OF ADOPTING DIRECT DRY TYPE COOLING SYSTEM FOR SUPERCRITICAL UNITS

Related Author

ZHU Ke
GAO Shenghui
ZHANG Fuzhong
GUO Zhijun
LI Tingyu Guohua Jinjie Energy Co Ltd
JIN Rong
SHI Qiguang
YANG Yanling

Related Institution

Guohua Jinjie Energy Co., Ltd
School of Energy and Environmental Engineering, Shanghai Electric Power University
School of Mechanical and Power Engineering, Shanghai Jiao Tong University
Shandong Electric Power Research Institute
Liaocheng Power Plant
0