RETROFIT OF CONTROL SYSTEM FOR AGC AND PRIMARY FREQUENCY CONVERSION BASED ON REGIONAL SYNCHRONIZING AND CLOSING INTO POWER GRID
|更新时间:2025-09-28
|
RETROFIT OF CONTROL SYSTEM FOR AGC AND PRIMARY FREQUENCY CONVERSION BASED ON REGIONAL SYNCHRONIZING AND CLOSING INTO POWER GRID
Thermal Power GenerationVol. 39, Issue 7, Pages: 69-71(2010)
作者机构:
神华国华(北京)电力研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.6
Published:2010
稿件说明:
移动端阅览
ZHANG Qiusheng, LIANG Hua, HU Xiaohua Shenhua Guohua(Beijing) Electric Power Research Institute Co Ltd. RETROFIT OF CONTROL SYSTEM FOR AGC AND PRIMARY FREQUENCY CONVERSION BASED ON REGIONAL SYNCHRONIZING AND CLOSING INTO POWER GRID[J]. Thermal power generation, 2010, 39(7): 69-71.
DOI:
ZHANG Qiusheng, LIANG Hua, HU Xiaohua Shenhua Guohua(Beijing) Electric Power Research Institute Co Ltd. RETROFIT OF CONTROL SYSTEM FOR AGC AND PRIMARY FREQUENCY CONVERSION BASED ON REGIONAL SYNCHRONIZING AND CLOSING INTO POWER GRID[J]. Thermal power generation, 2010, 39(7): 69-71.DOI:
RETROFIT OF CONTROL SYSTEM FOR AGC AND PRIMARY FREQUENCY CONVERSION BASED ON REGIONAL SYNCHRONIZING AND CLOSING INTO POWER GRID
A retrofit scheme for control circuits of automatic generation lontrol(AGC) and primary frequency cenversion based on regional synchronizing and closing into power grid has been presented.Reasonable design of the AGC control logic for the controlled regions should be made for eliminating the the influence of short-time fluctuation in AGC commands upon the stability in operation of units
and a comprehensive control system
which can give consideration both to safety and economic efficiency of units in operation
has to be disigned
increasing assessment indices for optimal load distribution system of units in the power plant.