CONTROL MEASURES FROM BOILER SIDE IN LOAD REJECTION TEST OF SUPERCRITICAL 600 MW UNIT
|更新时间:2025-09-28
|
CONTROL MEASURES FROM BOILER SIDE IN LOAD REJECTION TEST OF SUPERCRITICAL 600 MW UNIT
Thermal Power GenerationVol. 39, Issue 9, Pages: 85-88(2010)
作者机构:
华北电力科学研究院(西安)有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2010
稿件说明:
移动端阅览
DUAN Bao, LI Feng, ZHANG Zhijun North China Electric Power Research Institute (Xi'an) Co Ltd. CONTROL MEASURES FROM BOILER SIDE IN LOAD REJECTION TEST OF SUPERCRITICAL 600 MW UNIT[J]. Thermal power generation, 2010, 39(9): 85-88.
DOI:
DUAN Bao, LI Feng, ZHANG Zhijun North China Electric Power Research Institute (Xi'an) Co Ltd. CONTROL MEASURES FROM BOILER SIDE IN LOAD REJECTION TEST OF SUPERCRITICAL 600 MW UNIT[J]. Thermal power generation, 2010, 39(9): 85-88.DOI:
CONTROL MEASURES FROM BOILER SIDE IN LOAD REJECTION TEST OF SUPERCRITICAL 600 MW UNIT
combined with successful experiences of boiler hadn't tripped during 50% and 100% load rejection tests of supercritical 600 MW unit no.1 in Datang Binchang Power Plant
the difficult points of control from boiler side in load rejection test of supercritical units have been analysed
and some measures being put forward to decrease the drop magnitude of steam temperature
including suitably using the bypass system and PCV valve
rapidly decreasing the feed of fuel coal
as well as the evaporation capacity produced by residual heat of boiler
and the steam pressure;rapidly stratup the circulatory pump of boiler water
establishing the reasonable make-up water supplying mode for the boiler
maintaining the minimum flow rate of feed-water into the once-through boiler;using automatic control and timely manual adjustment mode to control all combustion parameters
make them to be stabilized;preventing water enters into the superheater due to too high water-level in the separator
and timely closing the electrically operated valve for desuperheating water etc.
so as to decrease the risk in load rejection test.