您当前的位置:
首页 >
文章列表页 >
ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
更新时间:2025-09-28
    • ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT

    • Thermal Power Generation   Vol. 39, Issue 7, Pages: 72-74(2010)
    • CLC: TM621.3
    • Published:2010

    移动端阅览

  • CHEN Xiaoqiang, LUO Zhihao, YIN Feng Zhejiang Provincal Electric Power Testing and Research Institute. ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2010, 39(7): 72-74. DOI:

  •  
  •  

0

Views

238

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
Control and optimization of water/coal ratio for an ultra supercritical1 000 MW unit
Design scheme and application of APS system in an ultra-supercritical 1 000 MW unit with double-reheat cycle
WATER-LEVEL CONTROL IN ULTRA-SUPERCRITICAL ONCE-THROUGH BOILER OF 1000 MW UNIT
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT

Related Author

LI Xinhu Guangzhou Yueneng Electric Power Science and Technology Development Co Ltd
ZHAO Zhidan
WANG Haitao
ZHANG Zhi
WANG Xiaoyong
NIU Haiming
WU Dongli
YANG Shuang

Related Institution

Guangzhou Yueneng Electric Power Technology Development Co., Ltd
Xi’an Thermal Power Research Institute Co., Ltd.
Liaoning Huadian Tieling Power Generation Co., Ltd.
Beijing Guodian Zhishen Co.,Ltd.
Guodian Taizhou Power Generation Co., Ltd.
0