ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
|更新时间:2025-09-28
|
ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
Thermal Power GenerationVol. 39, Issue 7, Pages: 72-74(2010)
作者机构:
浙江省电力试验研究院
作者简介:
基金信息:
DOI:
CLC:TM621.3
Published:2010
稿件说明:
移动端阅览
CHEN Xiaoqiang, LUO Zhihao, YIN Feng Zhejiang Provincal Electric Power Testing and Research Institute. ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2010, 39(7): 72-74.
DOI:
CHEN Xiaoqiang, LUO Zhihao, YIN Feng Zhejiang Provincal Electric Power Testing and Research Institute. ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2010, 39(7): 72-74.DOI:
ANALYSIS AND OPTIMIZATION OF RUN BACK CONTROL STRATEGY FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
Taking ultra-supercritical 1 000 MW units in Huaneng Yuhuan Power Plant and Guodian Beijing Power Plant as examples
on the basis of analysing problems occurred in the run back(RB) test
such as large fluctuation of negative pressure in the furnace
and of pressure in the primary air manifold
as well as large fluctuation of steam temperature resulting from serious misadjustment of the water/coal ratio
etc.
an optimization of control strategy for the furnace pressure
the pressure in primary air manifold
and the steam temperature during run back of the units have been carried out.Practical application shows that the effectiveness of RB control for units after optimization has been remarkably enhanced.
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
Control and optimization of water/coal ratio for an ultra supercritical1 000 MW unit
Design scheme and application of APS system in an ultra-supercritical 1 000 MW unit with double-reheat cycle
WATER-LEVEL CONTROL IN ULTRA-SUPERCRITICAL ONCE-THROUGH BOILER OF 1000 MW UNIT
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
Related Author
LI Xinhu Guangzhou Yueneng Electric Power Science and Technology Development Co Ltd
ZHAO Zhidan
WANG Haitao
ZHANG Zhi
WANG Xiaoyong
NIU Haiming
WU Dongli
YANG Shuang
Related Institution
Guangzhou Yueneng Electric Power Technology Development Co., Ltd
Xi’an Thermal Power Research Institute Co., Ltd.
Liaoning Huadian Tieling Power Generation Co., Ltd.