CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
|更新时间:2025-09-28
|
CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
Thermal Power GenerationVol. 39, Issue 7, Pages: 75-79(2010)
作者机构:
1. 马鞍山万能达发电有限责任公司
2. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TK229.66
Published:2010
稿件说明:
移动端阅览
MEI Sheng1, HAO Defeng2 1.Ma'anshan Wannengda Power Generation Co Ltd. CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS[J]. Thermal power generation, 2010, 39(7): 75-79.
DOI:
MEI Sheng1, HAO Defeng2 1.Ma'anshan Wannengda Power Generation Co Ltd. CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS[J]. Thermal power generation, 2010, 39(7): 75-79.DOI:
CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
摘要
针对淮北临焕电厂配循环流化床(CFB)锅炉的2×300 MW机组具有多变量、非线性、大迟延的特点
设计了协调、一次调频、燃料、一次风、二次风等控制策略。实际应用表明
该控制策略的控制效果较好。
Abstract
Directing against the features of 2×300 MW units equipped with CFB boilers in Huaibei Linhuan Power Plant
i.e.having multi-variables.non-linearity
and long time delay etc.
the control strategy for coordinaation
primary frequency conversion
fuel
primary air
and secondary air etc.
has been designed.Practical application shows that the designed strategy has better effectiveness.