您当前的位置:
首页 >
文章列表页 >
CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
更新时间:2025-09-28
    • CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS

    • Thermal Power Generation   Vol. 39, Issue 7, Pages: 75-79(2010)
    • CLC: TK229.66
    • Published:2010

    移动端阅览

  • MEI Sheng1, HAO Defeng2 1.Ma'anshan Wannengda Power Generation Co Ltd. CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS[J]. Thermal power generation, 2010, 39(7): 75-79. DOI:

  •  
  •  

0

Views

97

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT
RETROFIT FOR AIR STAGED BURNING AND OPERATION TEST OF BOILER NO.3 IN WULASHAN POWER PLANT
CHARACTERISTIC ANALYSIS OF TUBE-BURST OCCURRED ON HEATING SURFACE OF THE WATER-WALL IN 300 MW CFB BOILER
AUTOMATIC CONTROL SYSTEM OF SCR FLUE GAS DENITRIFICATION AND ITS APPLICATION IN SANHE POWER PLANT
ANALYSIS OF DESIGN FOR SWIRLING PULVERIZED COAL BURNERS WITH LOW NOx EMISSION

Related Author

HE Yingguang Datang Honghe Power Generation Co Ltd
ZUO Shuang-ji(Nei Monggol Industrial University
DONG Zhi-qian
ZHENG Tian-yang
CHENG Zhong-hui
WU YeDatang Honghe Power Generation Co Ltd
LI Feng
WANG Li

Related Institution

Datang Honghe Power Generation Co., Ltd
Inner Mongolia University of Technology
North China Electric Power Research Institute Xi'an Co., Ltd
Department of Thermal Engineering, Tsinghua University
Gansu Electric Power Research Institute
0