OPTIMIZATION OF CONTROL SYSTEM FOR 320 MW UNITS IN BEIHAI POWER PLANT
|更新时间:2025-09-28
|
OPTIMIZATION OF CONTROL SYSTEM FOR 320 MW UNITS IN BEIHAI POWER PLANT
Thermal Power GenerationVol. 39, Issue 8, Pages: 76-81(2010)
作者机构:
中电投北海发电厂
作者简介:
基金信息:
DOI:
CLC:TM621.6
Published:2010
稿件说明:
移动端阅览
GONG Xiaoyong, DU Zhixin, XIA Juntao, et al. OPTIMIZATION OF CONTROL SYSTEM FOR 320 MW UNITS IN BEIHAI POWER PLANT[J]. Thermal power generation, 2010, 39(8): 76-81.
DOI:
GONG Xiaoyong, DU Zhixin, XIA Juntao, et al. OPTIMIZATION OF CONTROL SYSTEM FOR 320 MW UNITS IN BEIHAI POWER PLANT[J]. Thermal power generation, 2010, 39(8): 76-81.DOI:
OPTIMIZATION OF CONTROL SYSTEM FOR 320 MW UNITS IN BEIHAI POWER PLANT
Directing against the problems existing in control system of 320 MW units in Beihai Power Plant
such as the coordinated control of units and automatic control of the forced draft fan(relating to oxygen quanlity) were unable to normally put into service during the time of start-up and shutdown for the coal pulverizer
and in the sootblowing process by using the boiler steam excited wave
large fluctuation of the main steam temperature
and bad behavior of automatic control for water-level in the drum of boiler
etc.
the control system has been optimized by using OPT-K software package.The automatic setting of conventional PID and the state observor constructed by introducing up-to-date control theory make the putting-into-operation rate of automatic control system and its regulating quality to be remarkable enhanced
solving the problems of large water-level fluctuation in boiler drum
as well as large disturbance of steam temperature etc.
the putting-into-operation situation of coordinated control between turbines and boilers being good.
STUDY ON APPLICATION OF DMC-PID CASCADE CONTROL FOR SUPERHEATED STEAM TEMPERATURE IN THERMAL POWER PLANTS
STUDY ON APPLICATION OF PREDICTIVE CONTROL BASED ON SUPERVISORY INFORMATION SYSTEM
PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
DESIGN OF THE INTEGRATED WATERANDSTEAM MONITORING SYSTEM BASED ON VIRTUAL INSTRUMENTS
APPLICATION OF PLC IN ASH DISPOSAL CONTROL SYSTEM FOR POWER PLANTS
Related Author
YE Zhi
LIU Wei
YANG Xin-min
LUO Yi
ZHANG Yuan-yuan
ZHANG Yi
DING Yan-jun North China Electric Power University
CHEN Shao min
Related Institution
Xi'an Thermal Power Research Institute Co., Ltd., Xi'an Thermal Power Research Institute Co., Ltd., Xi'an Thermal Power Research Institute Co., Ltd. Shaanxi Xi'an 710032, Shaanxi Xi'an 710032