您当前的位置:
首页 >
文章列表页 >
STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT
更新时间:2025-09-28
    • STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT

    • Thermal Power Generation   Vol. 39, Issue 8, Pages: 45-50(2010)
    • CLC: TK223.26
    • Published:2010

    移动端阅览

  • LIU Jiayu1, WANG Baohua2, YUE Jiaquan1, et al. STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT[J]. Thermal power generation, 2010, 39(8): 45-50. DOI:

  •  
  •  

0

Views

728

下载量

62

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPARISON OF STRUCTURAL DESIGN FOR THREE 1000 MW STEAM TURBINES
OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT
STUDY ON THE CONTROL MODEL OF INTERMEDIARY POINT TEMPERATURE IN BOILER OF ULTRA-SUPERCRITICAL UNIT BASED ON DYNAMIC MECHANISM ANALYSIS
COMPARISON OF STEAM DISTRIBUTION MODES FOR ULTRA-SUPERCRITICAL 1 000 MW UNITS
NUMERICAL SIMULATION OF PULVERIZED COAL DISTRIBUTOR FORBOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT

Related Author

ZHU Bao-tianXi'an Thermal Power Research Institute Co Ltd
ZHU Jiang-tao
ZHU Jie-nan
GAO Jin-yao
WU Yong-cun
WANG HuiGuohua Zheneng Power Generation Co Ltd
FANG Yanjun1
LI Xin1

Related Institution

Guohua Zhejiang Energy Generation Co., Ltd
Department of Automation, Wuhan University
Guangdong Power Grid Corporation Electric Power Science Research Institute
School of Power and Mechanical Engineering, Wuhan University
School of Power Machinery, Wuhan University
0