您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF PERFORMANCE FOR P91/92 MAIN STEAM PIPELINE AFTER WATER QUENCHING IN THE PROCESS OF HEAT TREATMENT
更新时间:2025-09-28
    • ANALYSIS OF PERFORMANCE FOR P91/92 MAIN STEAM PIPELINE AFTER WATER QUENCHING IN THE PROCESS OF HEAT TREATMENT

    • Thermal Power Generation   Vol. 39, Issue 9, Pages: 113-115(2010)
    • CLC: TM621.72
    • Published:2010

    移动端阅览

  • XU Jiangxiao1, CHANG Jianbing1, QIU Minglin2, et al. ANALYSIS OF PERFORMANCE FOR P91/92 MAIN STEAM PIPELINE AFTER WATER QUENCHING IN THE PROCESS OF HEAT TREATMENT[J]. Thermal power generation, 2010, 39(9): 113-115. DOI:

  •  
  •  

0

Views

117

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND DISPOSAL OF JOINT INTERFACE MISPLACEMENT OCCURRED ON INLET PIPE OF MAIN STEAM VALVE FOR ONE 200 MW UNIT
STRENGTH ANALYSIS OF HOT EXTRUDED TEE-TYPE UNEQUAL-DIAMETER THREE-WAY JOINT FOR MAIN STEAM PIPELINE OF ULTRA-SUPERCRITICAL UNIT
SIMULATION AND ANALYSIS ABOUT WORN-OUT ON CONNECTING PIPE OF LOW-PRESSURE REHEATER FOR A BOILER OF 600 MW UNIT
Simulation calculation of effect of coal chemical wastewater on coal water slurry gasification syngas
Simulation study on removing SO2 and CO2 from flue gas by cryogenic scrubbing

Related Author

LI Song31.Zhongdian Guohua Beijing Thermal Power Branch Company
KANG Yu-jun3
AN Fu-li3
LIU Ke-ming2
LI Jian-wei2
GUO Zong-hua1
XING Cang11.China Huadian Engineering Corporation Ltd
YAN Ping1

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Guodian Jingyuan Power Generation Co., Ltd
Zhongdian Guohua Beijing Thermal Power Branch
Beijing University of Science and Technology
China Huadian Engineering (Group) Co., Ltd
0