XU Fangyou1, HU Guangming1, LIU Guangyao2, et al. OPERATION OPTIMIZATION AND ECONOMIC EFFICIENCY DIAGNOSIS ON COLD END SYSTEM OF 300 MW UNIT IN SHAJIAO A POWER PLANT[J]. Thermal power generation, 2010, 39(7): 7-10.
DOI:
XU Fangyou1, HU Guangming1, LIU Guangyao2, et al. OPERATION OPTIMIZATION AND ECONOMIC EFFICIENCY DIAGNOSIS ON COLD END SYSTEM OF 300 MW UNIT IN SHAJIAO A POWER PLANT[J]. Thermal power generation, 2010, 39(7): 7-10.DOI:
OPERATION OPTIMIZATION AND ECONOMIC EFFICIENCY DIAGNOSIS ON COLD END SYSTEM OF 300 MW UNIT IN SHAJIAO A POWER PLANT
The performance of cold end system for thermal power unit directly affects the thermal economic efficiency and safety of the whole unit.Directing against the cold end system of unit no.4 in Shajiao A Power Plant
the optimal operation mode of circulating water pumps under different loads and different temperature of circulating water has been studied and obtained.Through caculation under variation of operating conditions
the terminal temperature difference of condenser
the temperature rise of circulating water
and standard value of exhausted steam temperature under different operating conditions of unit have found.The economic efficiency diagnosis at cold end system of said unit shows that the terminal temperature difference of condenser for this unit in winter and spring season was somewhat higher
this is due to steam condensation in pipeline connecting to the vacuum pump
there fore
the monitoring should be strengthened
and the condensate thereof has to be timely discharged
so as to enhance th economic efficiency in operation of unit.