您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF CRIPPLING FAILURE FOR MP 10TH DIAPHRAGM AND BLADES OF 300MW STEAM TURBINE IN ONE POWER PLANT AND DISPOSAL THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF CRIPPLING FAILURE FOR MP 10TH DIAPHRAGM AND BLADES OF 300MW STEAM TURBINE IN ONE POWER PLANT AND DISPOSAL THEREOF

    • Thermal Power Generation   Vol. 39, Issue 10, Pages: 80-81(2010)
    • CLC: TM621
    • Published:2010

    移动端阅览

  • SUN Lijun, NI GuijieZhengzhou Electric Power Senior Professional College. CAUSE ANALYSIS OF CRIPPLING FAILURE FOR MP 10TH DIAPHRAGM AND BLADES OF 300MW STEAM TURBINE IN ONE POWER PLANT AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(10): 80-81. DOI:

  •  
  •  

0

Views

147

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

FAILURE ANALYSIS AND PREVENTION OF "851"BLADE BREAKAGE
MECHANISM ANALYSIS OF PITTING ATTACK DAMAGE FOR BLADES OF 300MW STEAM TURBINE AND PREVENTIVE MEASURES THEREOF
Reason analysis for fracture occurred in axial induced draft fan blade of a 600 MW unit
Security analysis of blade-disc in governing stage under various sequence valve modes
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT

Related Author

王荻
朱洪波
程绍兵
刁伟辽
GU Weiwei
ZHANG Yonghai
LI Yuan
YU Xiaobing

Related Institution

Guangdong Electric Power Test and Research Institute
Guangdong Electric Power Group Co., Ltd.
Guangdong Electric Power Industry School
Guangdong Electric Power Industry School Guangzhou
0