您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF THE COMBUSTION CONTROL SYSTEM FOR BOILERS EQUIPPED WITH 330 MW UNIT IN SHENHUA GUOHUA ZHUNGE'R POWER PLANT
更新时间:2025-09-28
    • OPTIMIZATION OF THE COMBUSTION CONTROL SYSTEM FOR BOILERS EQUIPPED WITH 330 MW UNIT IN SHENHUA GUOHUA ZHUNGE'R POWER PLANT

    • Thermal Power Generation   Vol. 39, Issue 7, Pages: 62-64(2010)
    • CLC: TK223.72
    • Published:2010

    移动端阅览

  • WANG Guanding, WANG Wenbin, AN Huiyong, et al. OPTIMIZATION OF THE COMBUSTION CONTROL SYSTEM FOR BOILERS EQUIPPED WITH 330 MW UNIT IN SHENHUA GUOHUA ZHUNGE'R POWER PLANT[J]. Thermal power generation, 2010, 39(7): 62-64. DOI:

  •  
  •  

0

Views

203

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF HIGH TEMPERATURE CORROSION OCCURRED ON THE WATER-WALL AND RESOLUTION MEASURES THEREOF
DISTRIBUTION OF TRACE ELEMENTS IN EMISSIION FROM COAL-WATER-SLURRY FIRED BOILERS
CALCULATION OF PULVERIZED COAL CONCENTRATION BASED ON DATA FUSION METHOD OF STATE,SPACE AND DISTANCE
TEST STUDY ON CONTROLLING HEAT DEVIATION IN UTILITY BOILERS BY USING JET-FLOW READJUSTING METHOD
AN APPROACH TO APPLICATION OF COMBUSTION OPTIMIZING SYSTEM ONTO BOILERS

Related Author

ZHANG Guo-bing
MENG De-run
ZHAO Xiang
YANG Xiao-gang
YANG Wei-juan
LIU Jian-zhong
ZHOU Jun-hu
CEN Ke-fa (Zhejiang University

Related Institution

Hejin Power Plant
Zhejiang University
浙江大学
PRC
4:浙江大学
0