RETROFIT OF THE FLOW PASSAGE FOR HIGH AND MEDIUM PRESSURE CYLINDERS OF STEAM TURBINE EQUIPPED FOR 215MW UNIT
|更新时间:2025-09-28
|
RETROFIT OF THE FLOW PASSAGE FOR HIGH AND MEDIUM PRESSURE CYLINDERS OF STEAM TURBINE EQUIPPED FOR 215MW UNIT
Thermal Power GenerationVol. 39, Issue 10, Pages: 82-84(2010)
作者机构:
山西漳泽发电分公司
作者简介:
基金信息:
DOI:
CLC:TK262
Published:2010
稿件说明:
移动端阅览
WAGN ChenyuShanxi Zhangze Power Generation Branch Co. RETROFIT OF THE FLOW PASSAGE FOR HIGH AND MEDIUM PRESSURE CYLINDERS OF STEAM TURBINE EQUIPPED FOR 215MW UNIT[J]. Thermal power generation, 2010, 39(10): 82-84.
DOI:
WAGN ChenyuShanxi Zhangze Power Generation Branch Co. RETROFIT OF THE FLOW PASSAGE FOR HIGH AND MEDIUM PRESSURE CYLINDERS OF STEAM TURBINE EQUIPPED FOR 215MW UNIT[J]. Thermal power generation, 2010, 39(10): 82-84.DOI:
RETROFIT OF THE FLOW PASSAGE FOR HIGH AND MEDIUM PRESSURE CYLINDERS OF STEAM TURBINE EQUIPPED FOR 215MW UNIT
摘要
论述了漳泽发电分公司前苏制215 MW机组汽轮机高中压缸通流部分改造的效果。通过改造
高压缸效率达到84.43%
中压缸效率为93.94%
热耗率为7 989.4 kJ/(kW.h)。在纯凝工况下
机组热耗降低了337 kJ/(kW.h)
煤耗降低12.7 g/(kW.h)
年节约标煤1.50万t
改造投资2.5年即可收回。并且
在把泵凝汽式改为调节抽汽式汽轮机后
供热工况下最大抽汽流量达到340 t/h
可降低煤耗20 g/(kW.h)以上。
Abstract
The effectiveness of flow passage retrofit for high and medium cylinders of former soviet-made steam turbine equipped for 215MW unit in Zhangze Power Generation Branch Company has been explicated.Through retrofit
the efficiency of high pressure cylinder and of medium cylinder reaches 84.43% and 93.94% respectively
and the specific heat consumption reaches 7 989.4 kJ/(kW·h).Under operating condition of pure condensation
the heat consumption rate decreases 337 kJ/(kW·h)
the coal consumption rate reduces 12.7 g/(kW·h)
the standar coal can be saved fifteen thousand tons per year
the capital investment in retrofit can be taken back within two and a half year.Under operating condition of heat supply
the maximum extract steam flow rate reaches 340 t/h
the coal consumption rate can be reduced 20 g/(kW·h) and more.
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS AND IMPROVEMENT MEASURES FOR PRESSURE REDUCTION OF LUBRICANT OIL DURING STARTUP OF 300MW UNITS