ANALYSIS OF PROBLEMS EXISTING IN THE SYSTEM CONNECTING CATION BED AND ANION BED IN SERIES FOR CONDENSATE POLISHING TREATMENT AND IMPROVEMENT THEREOF
|更新时间:2025-09-28
|
ANALYSIS OF PROBLEMS EXISTING IN THE SYSTEM CONNECTING CATION BED AND ANION BED IN SERIES FOR CONDENSATE POLISHING TREATMENT AND IMPROVEMENT THEREOF
Thermal Power GenerationVol. 39, Issue 8, Pages: 67-71(2010)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.8
Published:2010
稿件说明:
移动端阅览
HUANG Wanqi, CAO Songyan, CHANG Xuhong, et al. ANALYSIS OF PROBLEMS EXISTING IN THE SYSTEM CONNECTING CATION BED AND ANION BED IN SERIES FOR CONDENSATE POLISHING TREATMENT AND IMPROVEMENT THEREOF[J]. Thermal power generation, 2010, 39(8): 67-71.
DOI:
HUANG Wanqi, CAO Songyan, CHANG Xuhong, et al. ANALYSIS OF PROBLEMS EXISTING IN THE SYSTEM CONNECTING CATION BED AND ANION BED IN SERIES FOR CONDENSATE POLISHING TREATMENT AND IMPROVEMENT THEREOF[J]. Thermal power generation, 2010, 39(8): 67-71.DOI:
ANALYSIS OF PROBLEMS EXISTING IN THE SYSTEM CONNECTING CATION BED AND ANION BED IN SERIES FOR CONDENSATE POLISHING TREATMENT AND IMPROVEMENT THEREOF
A system connecting cation bed and anion bed in series for condensate polishing treatment was used for 2×300 MW direct air-cooled units in one power plant
the main problems existing in operation of said system are as follows:(1)in the initial period of putting cation bed and anion bed into operation
contaminant ion leakage had occurred in the effluent water;in case of cation bed is in operation according to ammonium type
chlorine ion leakage appeared in effluent water from the anion bed.For this
improvement scheme has been put forward after discuss and analysis in the following:(1)enhancing regenerative level of the resins;(2)sufficiently positive cleaning
after the end of flushing resin in the storage tank
the conductivity of effluent water should be less than 1 μS/cm;(3)designing reasonable cyclic flushing system for initial period of putting cation bed and anion bed into operation
and reasonably arrange the manipulation of putting them into operation.After implementation of the improvement scheme
the ion leakage problem existing in original system has been basically solved.
Application of high crosslinked gel type cation exchange resin and porous type anion exchange resin for condensate polishing in a 1 060MW air-cooled unit
Technical schemes of improving operation performance of direct air-cooling units in summer:a review
DEVELOPMENT OF HOME-MADE POWDERED RESIN AND TEST IN APPLICATION THEREOF
Operation and control of the condensate polishing mixed beds
Steam-water quality control points of a supercritical 660MW air cooling unit in construction period
Related Author
LI Huanfang
Izuru Tokumaru
MA Tingshan
La Kai
CHEN Shengli
JING Tao
LI Gaochao
WAN Chao
Related Institution
Huadian Ningxia Lingwu Power Generation Co., Ltd
Mitsubishi Chemical Corporation
Xi'an Thermal Power Research Institute Co.,Ltd.
Baotou First Thermal Power Plant of Northern United Power Co., Ltd