STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT
|更新时间:2025-09-28
|
STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT
Thermal Power GenerationVol. 39, Issue 9, Pages: 64-67(2010)
作者机构:
1. 西安热工研究院有限公司
2. 华能井冈山电厂
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2010
稿件说明:
移动端阅览
MA Xiaolong1, MENG Yingqi1, ZHONG Mingcai2, et al. STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT[J]. Thermal power generation, 2010, 39(9): 64-67.
DOI:
MA Xiaolong1, MENG Yingqi1, ZHONG Mingcai2, et al. STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT[J]. Thermal power generation, 2010, 39(9): 64-67.DOI:
STUDY ON TRIAL OPERATION OF THE POWER-GENERATING UNIT WITHOUT MOTER-DRIVEN FEED-WATER PUMP BY USING THAT OF THE NEIGHBOURING UNIT
摘要
电动给水泵(电泵)是电厂主要的耗能设备。为了降低厂用电率及投资
某些设计提出了取消电泵的方案
形成了无电泵的发电机组。以某电厂使用2号机组电泵为3号机组供水的试运行为例
研究了无电泵发电机组利用相邻机组电泵供水方法的可行性。试运行结果表明
在2号机组运行不受影响的情况下
3号机组试运行工期比正常提前了40多天。
Abstract
Motor-driven feed-water pump is the largest energy-comsuming equipment in power plants.In order to reduce the service-power consumption rate and capital investment
the motor-driven feed-water pump has been cancelled in some design schemes
resulting in power generating unit without motor-driven feed-water pump.Taking trial operation process in one power plant for supplying feed-water to unti no.3 by using the motor-driven feed-water pump of unit no.2 as an example
the feasibility of using the motor-driven feed-water pump of a neighbouring unit to supply feed-water to a unit without said feed-water pump has been studied.The trial operation shows that the trial operation time of unit no.3 has moved up more than 40 days as in convintonal case under condition of the operation of unit no.2 being not affected.