OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS
|更新时间:2025-09-28
|
OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS
Thermal Power GenerationVol. 39, Issue 11, Pages: 69-72(2010)
作者机构:
1. 神华国华电力研究院有限公司
2. 山西省电力公司
作者简介:
基金信息:
DOI:
CLC:TM621.4
Published:2010
稿件说明:
移动端阅览
ZHAO Jun1, HOU Liping2 1.Shenhua Guohua Electric Power Research Institute Co Ltd. OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS[J]. Thermal power generation, 2010, 39(11): 69-72.
DOI:
ZHAO Jun1, HOU Liping2 1.Shenhua Guohua Electric Power Research Institute Co Ltd. OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS[J]. Thermal power generation, 2010, 39(11): 69-72.DOI:
OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS
To enhance the succesful rate of runback(RB) for subcritical units is a difficult problem in the thermodynamic control.The reliability of RB functions for units administrated by Guohua Electric Power Company
and scattered in power grid of eight regions
all are somewhat lower
along with increasing the output capacity of units participated into peak-load regulation
the influence of un-scheduled unit-trip upon safe operation of the power grid is increased.For this
directing against the defects existing in RB control logic of feed-water pumps and primary air fans
optimization of control logic for RB target load calculation
RB speed rate calculation
RB's reset circuit
trip circuit of the coal pulverizer
and the automatic interlocking of feed-water pumps etc.have been carried out.After optimization
the application on one subcritical 600 MW unit shows that the control system can satisfy the requirements of RB for feed-water pump and primary air fan.In the RB process of primary air fan
the pressure in primary air manifold can be reduced to minimum 4.94 kPa in time duration of 3 s;in RB process of the feed-water pump
water-level in the drum is decreased from-40 mm to the minimum-187 mm.