您当前的位置:
首页 >
文章列表页 >
AN APPROACH TO AND ANALYSIS OF START-UP FOR THE SUPERCRITICAL 600MW UNIT THROUGH IP CYLINDER
更新时间:2025-09-28
    • AN APPROACH TO AND ANALYSIS OF START-UP FOR THE SUPERCRITICAL 600MW UNIT THROUGH IP CYLINDER

    • Thermal Power Generation   Vol. 39, Issue 10, Pages: 10-13(2010)
    • CLC: TK263
    • Published:2010

    移动端阅览

  • GAO Qinglin1, ZHONG Jiankang2, CHEN Dunbing31.Fujian Electric Power Professional Technological College. AN APPROACH TO AND ANALYSIS OF START-UP FOR THE SUPERCRITICAL 600MW UNIT THROUGH IP CYLINDER[J]. Thermal power generation, 2010, 39(10): 10-13. DOI:

  •  
  •  

0

Views

95

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND REMEDY FOR VIBRATION OCCURRED ON 330 MW TURBO-GENERATOR SETS MADE BY ROMANIA
AN APPROACH TO NEW DEFINITION OF THE OPTIMAL VACUUM IN CONDENSERS
ANALYSIS AND DISPOSAL OF ABNORMAL VIBRATION FOR 600 MW TURBO-GENERATOR SETS
DIAGNOSIS AND DISPOSAL OF BEARING PEDESTAL'S AXIAL VIBRATION FAULTY FOR THE TURBO-GENERATOR SET
DIAGNOSIS OF VIBRATION FAULT ON TURBO-GENERATOR SET BASED ON ROUGH SET THEORY AND NAIVE BAYESIAN CLASSIFICATION ALGORITHM

Related Author

LI Jian
DANG Yuan-jian
GUO Ping-ying
QIAN Xu-ming 1.Changxing Power Generation Co Ltd
XU Hao
CHEN Yu-hao
ZHANG Xi-gen
YANG Qin

Related Institution

Northwest Electric Power Test and Research Institute
Changxing Power Generation Co., Ltd
Zhejiang Electric Power Construction Supervision Co., Ltd
Guohua Zhejiang Energy Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
0