您当前的位置:
首页 >
文章列表页 >
TEST STUDY ON AFFECTING FACTORS UPON DUAL-PRESSURE CONDENSER'S PERFORMANCE UNDER CONDITION OF VACUUM PUMP WITH HEADER SYTEM
更新时间:2025-09-28
    • TEST STUDY ON AFFECTING FACTORS UPON DUAL-PRESSURE CONDENSER'S PERFORMANCE UNDER CONDITION OF VACUUM PUMP WITH HEADER SYTEM

    • Thermal Power Generation   Vol. 39, Issue 9, Pages: 61-63(2010)
    • CLC: TB752
    • Published:2010

    移动端阅览

  • GUO Jianglong1, CAO Zhengxuan2, WANG Tianwei2, et al. TEST STUDY ON AFFECTING FACTORS UPON DUAL-PRESSURE CONDENSER'S PERFORMANCE UNDER CONDITION OF VACUUM PUMP WITH HEADER SYTEM[J]. Thermal power generation, 2010, 39(9): 61-63. DOI:

  •  
  •  

0

Views

58

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT
ANALYSIS AND TREATMENT OF SOMEWHAT LOWER VACUUM OF 600 MW UNIT IN QINSHAN NUCLEAR POWER STATION
AN APPROACH TO NEW DEFINITION OF THE OPTIMAL VACUUM IN CONDENSERS
CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF
CAUSE ANALYSIS OF ABNORMAL LOW-PRESSURE DIFFERENTIAL EXPANSION FOR 125 MW STEAM TURBINE AND REMEDY THEREOF

Related Author

AN Gui-cheng
WANG Zhihong
QIAN Xu-ming 1.Changxing Power Generation Co Ltd
XU Hao
CHEN Yu-hao
ZHANG Xi-gen
YANG Qin
WANG Cheng-liang Laicheng Power Plant

Related Institution

Yangmei Group Coal Gangue Power Plant
Jiangsu Electric Power Research Institute
Changxing Power Generation Co., Ltd
Zhejiang Electric Power Construction Supervision Co., Ltd
Laicheng Power Plant
0