RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER
|更新时间:2025-09-28
|
RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER
Thermal Power GenerationVol. 39, Issue 11, Pages: 49-50(2010)
作者机构:
1. 大唐红河发电有限责任公司
2. 西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TK229.6
Published:2010
稿件说明:
移动端阅览
NIU Shuyun1, LI Sheng1, JIANG Jianzhong2 1.Datang Honghe Power Generation Co Ltd. RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER[J]. Thermal power generation, 2010, 39(11): 49-50.
DOI:
NIU Shuyun1, LI Sheng1, JIANG Jianzhong2 1.Datang Honghe Power Generation Co Ltd. RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER[J]. Thermal power generation, 2010, 39(11): 49-50.DOI:
RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER
The problems existing on fabric joints in return chute of two 300 MW CFB boilers in Datang Honghe Power Generation Co Ltd are overtemperature
burn-out of ring
and leakage etc.
the causes resulting in above-mentioned problems have been analysed
and retrofit scheme being put forward
including optimization of the sealing structure
adujustment of the reserved expansion clearance between the return chute and the furnace
and repair of abrasion-resistant refractory material inside the return chute etc..After retrofitting
the non-scheduled shutdown of units due to above-mentioned problems occurred on fabric expansion joints in return chute has been fundamentally resolved
enhancing safety and economic efficiency of the boilers.