COMMISSION DEBUGGING AND ANALYSIS OF THE SOFTENING EQUIPMENT IN WASTEWATER PRETREATMENT SYSTEM OF FGD
|更新时间:2025-09-28
|
COMMISSION DEBUGGING AND ANALYSIS OF THE SOFTENING EQUIPMENT IN WASTEWATER PRETREATMENT SYSTEM OF FGD
Thermal Power GenerationVol. 40, Issue 2, Pages: 76-78(2011)
作者机构:
1. 西安热工研究院有限公司
2. 三门峡华阳发电有限责任公司
3. 河源电厂
作者简介:
基金信息:
DOI:
CLC:X703
Published:2011
稿件说明:
移动端阅览
YUAN Guoquan1, ZHANG Jiangtao1, PAN Zhenbo2, et al. COMMISSION DEBUGGING AND ANALYSIS OF THE SOFTENING EQUIPMENT IN WASTEWATER PRETREATMENT SYSTEM OF FGD[J]. Thermal power generation, 2011, 40(2): 76-78.
DOI:
YUAN Guoquan1, ZHANG Jiangtao1, PAN Zhenbo2, et al. COMMISSION DEBUGGING AND ANALYSIS OF THE SOFTENING EQUIPMENT IN WASTEWATER PRETREATMENT SYSTEM OF FGD[J]. Thermal power generation, 2011, 40(2): 76-78.DOI:
COMMISSION DEBUGGING AND ANALYSIS OF THE SOFTENING EQUIPMENT IN WASTEWATER PRETREATMENT SYSTEM OF FGD
In order to satisfy the requirement of wastewater zero emission from the whole of Heyuan Power Plant
the wastewater from FGD system had been treated by using pretreatment system plus evaporative crystallization technology.The said pretreatment system adopts two-stage reaction plus precipitation and clarification treatment
the content of calcium and magnesium has been reduced through injecting lime and sodium carbonate.The technological process of wastewater treatment system for FGD as well as the debugging and operation situation of the softening equipment have been presented.Results of operation show that the operation of softening equipment in wastewater pretreatment system is stable
the quality of effluent water reaching the requirement of intaking water quality for evaperative crystallization treatment system.