ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF
|更新时间:2025-09-28
|
ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF
Thermal Power GenerationVol. 39, Issue 11, Pages: 53-56(2010)
作者机构:
1. 浙江省电力试验研究院
2. 国电浙江北仑第一发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK267
Published:2010
稿件说明:
移动端阅览
TONG Xiaozhong1, ZHANG Bao1, ZHOU Yizhe2, et al. ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(11): 53-56.
DOI:
TONG Xiaozhong1, ZHANG Bao1, ZHOU Yizhe2, et al. ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(11): 53-56.DOI:
ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF
In the process of load rejection test for one 600 MW steam turbine unit
a repeated fluctuation phenomenon of open degree for reheated steam control valve and appeared in the fast closing process
leading to actuation of the overspeed protection for the steam turbine.Through analysis of the test results and of the fast closing process for reheated steam control valve
and combining with the fast closing test of said valve under dynamic state
it is believed that the fundamental cause resulting in abnormal fast closing process of the reheated steam control valve is the sudden drop of pressure in the pressure-equializing chamber.The disposal measure of drilling holes on the sleeve of said control valve has been adopted
test result after retrofitting shows that the said measure is simple and convenient