您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF
更新时间:2025-09-28
    • ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF

    • Thermal Power Generation   Vol. 39, Issue 11, Pages: 53-56(2010)
    • CLC: TK267
    • Published:2010

    移动端阅览

  • TONG Xiaozhong1, ZHANG Bao1, ZHOU Yizhe2, et al. ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF[J]. Thermal power generation, 2010, 39(11): 53-56. DOI:

  •  
  •  

0

Views

105

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF BOLT GROUP FAILURE ON REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE

Related Author

QIAO Lijie
GUO Yanjun Huadian Electric Power Science Research Institute

Related Institution

Huadian Electric Power Research Institute
0