您当前的位置:
首页 >
文章列表页 >
STUDY ON LIFE MANAGEMENT TECHNOLOGY FOR BOILERS OF ULTRA-SUPERCRITICAL 1000MW UNTIS
更新时间:2025-09-28
    • STUDY ON LIFE MANAGEMENT TECHNOLOGY FOR BOILERS OF ULTRA-SUPERCRITICAL 1000MW UNTIS

    • Thermal Power Generation   Vol. 39, Issue 11, Pages: 13-15(2010)
    • CLC: TK229.2
    • Published:2010

    移动端阅览

  • DU Baohua1, LI Yaojun1, LIU Zhenyu1, et al. STUDY ON LIFE MANAGEMENT TECHNOLOGY FOR BOILERS OF ULTRA-SUPERCRITICAL 1000MW UNTIS[J]. Thermal power generation, 2010, 39(11): 13-15. DOI:

  •  
  •  

0

Views

256

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
STUDY ON CONSTRUCTION OF HEAT RELEASE SIGNAL FOR ULTRA-SUPERCRITICAL UNITS
SCALING ON THROTTLE PLATE OF THE WATER-WALL IN BOILER FOR ULTRA-SUPERCRITICAL UNIT AND DISPOSAL THEREOF
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
TUBE BURST OF FINAL REHEATER ON BOILER OF A 1 000 MW ULTRA SUPERCRITICAL UNIT:CAUSE ANALYSIS

Related Author

WANG Xin-ge
LI Hong-tao
LIANG Mao-chun Huadian Zouxian Power Plant
SUN Qun-li
LI Jia-chuan
WANG Zhao
MA Yu-miao College of Energy and Power Engineering
SHAO Tian-youHuaneng Yuhuan Power Plant

Related Institution

Huadian Zouxian Power Plant
College of Energy and Power Engineering, North China Electric Power University
Guangzhou Yueneng Electric Power Technology Development Co., Ltd
Guangdong Huizhou Pinghai Power Plant Co., Ltd
Huaneng Anyuan Power Generation Co., Ltd.
0