A NECESSARY AND SUFFICIENT CONDITION FOR DETERMINING THE FEASIBILITY OF GENERATING UNITS COMBINATION WITH SECURITY CONSTRAINT
|更新时间:2025-09-28
|
A NECESSARY AND SUFFICIENT CONDITION FOR DETERMINING THE FEASIBILITY OF GENERATING UNITS COMBINATION WITH SECURITY CONSTRAINT
Thermal Power GenerationVol. 40, Issue 3, Pages: 39-45(2011)
作者机构:
1. 陕西理工学院数学系
2. 西安交通大学系统工程研究所
作者简介:
基金信息:
DOI:
CLC:TM621.3
Published:2011
稿件说明:
移动端阅览
GUO Sangang1, ZHANG Lin1, ZHAI Qiaozhu2, et al. A NECESSARY AND SUFFICIENT CONDITION FOR DETERMINING THE FEASIBILITY OF GENERATING UNITS COMBINATION WITH SECURITY CONSTRAINT[J]. Thermal power generation, 2011, 40(3): 39-45.
DOI:
GUO Sangang1, ZHANG Lin1, ZHAI Qiaozhu2, et al. A NECESSARY AND SUFFICIENT CONDITION FOR DETERMINING THE FEASIBILITY OF GENERATING UNITS COMBINATION WITH SECURITY CONSTRAINT[J]. Thermal power generation, 2011, 40(3): 39-45.DOI:
A NECESSARY AND SUFFICIENT CONDITION FOR DETERMINING THE FEASIBILITY OF GENERATING UNITS COMBINATION WITH SECURITY CONSTRAINT
摘要
在拉格朗日松弛框架下
具有安全约束的发电机组组合问题的求解可以分为2个步骤:一是通过求解问题的对偶
以获得原问题近似可行、甚至近优的机组状态
再通过启发式方法或者通过求解一个整数规划问题
调整某些机组的状态
从而获得一个可行的、近优的机组组合状态;二是求解各个调度时段上处于开机状态机组的发电功率
使发电成本最小化。因此
判断某时段机组组合状态是否可行显得尤为重要。为此
利用Benders分解可行性定理
给出并证明了安全约束机组组合可行的充分必要条件以及数值计算方法。结合某电力系统测试算例
验证了相关理论和算法的有效性。
Abstract
Under the Lagrangian Relaxation Framework
the procedure for solving units combination with security constraint(UCWSC) can be divided into two steps.The one step is to obtain a near feasible and suboptimal units combination at a horizontal time by solving the dual problem of UCWSC
and then a units combination is obtained by using some heuristic methods or by solving a series of integer programming problems
to regulate the situation of some units
therefrom
a feasible and near optimal configuration of units combination is obtained;the other step is solving the generating power of units being in operation at various dispatching time section
to make the generation cost to be the minimum.Therefore
judging a units combination being feasible or not in one time section is becoming moreimportant.For this
by using Bender's theorem for feasibility decomposition
the necessary and sufficient condition for determining the feasibility of a UCWSC and the numerical calculation method have been given
and being proven.Combined with the calculation example in test of one power system
the effective of the related theory and algorithm has been verified.