PROBLEMS OCCURRED IN OPERATION OF WET FGD WITHOUT BY-PASS AND COUNTERMEASURES THEREOF
|更新时间:2025-09-28
|
PROBLEMS OCCURRED IN OPERATION OF WET FGD WITHOUT BY-PASS AND COUNTERMEASURES THEREOF
Thermal Power GenerationVol. 40, Issue 5, Pages: 56-59(2011)
作者机构:
1. 西安热工研究院有限公司
2. 国华神木发电有限公司
作者简介:
基金信息:
DOI:
CLC:X701.3
Published:2011
稿件说明:
移动端阅览
NIU Yongjun1, YANG Cheng2 1.Xi'an Thermal Power Research Institute Co Ltd. PROBLEMS OCCURRED IN OPERATION OF WET FGD WITHOUT BY-PASS AND COUNTERMEASURES THEREOF[J]. Thermal power generation, 2011, 40(5): 56-59.
DOI:
NIU Yongjun1, YANG Cheng2 1.Xi'an Thermal Power Research Institute Co Ltd. PROBLEMS OCCURRED IN OPERATION OF WET FGD WITHOUT BY-PASS AND COUNTERMEASURES THEREOF[J]. Thermal power generation, 2011, 40(5): 56-59.DOI:
PROBLEMS OCCURRED IN OPERATION OF WET FGD WITHOUT BY-PASS AND COUNTERMEASURES THEREOF
Elimination of flue gas by-pass is a gradually developing new tendency in flue gas desulphurization(FGD) area.The problems may occurin operation of wet FGD without by-pass are as follows:during cold-state start-up of boilers
the unburned oil stain and carbon particles etc in combustion-suppoting oil may result in pollution of the slurry from absorption tower of the FGD system
making it to cease being effective
and result in contamination and blockage of blades in the demister;the change of operation condition
such as sudden change of sulfer content in fuel coal
may affect the FGD system etc..For these
some general countermeasures have been put forward
i.e.before ignition and start-up of the boiler
especially before cold-state start-up
it is necessary to heat the ash hopper
insulating post sleeve
and insulated chamber of discharge electrodes for the electrostatic precipitator in advance of 24 h;ensure reliably putting the emergency sparying desuperheating devive at inlet of the desulphurization tower into service;at stage of injecting combustion-supporting oil to start the boiler up from cold-state
as well as injecting combustion-stabilizing oil under low load
the flushing frequency and flushing water quantity for the demister have to be increased;during abnormity of slurry from the absorpton tower
the slurry has to be replaced;controlling the quality of fuel coal
especially the ash content and sulfer content in the coal;strengthening chemical supervision for the FGD system