您当前的位置:
首页 >
文章列表页 >
RETROFIT OF A 75 t/h PULVERRIZED COAL BOILER INTO ONE BOILER OF MIXEDLY BURNING PULVERIZED COAL AND COAL GAS
更新时间:2025-09-28
    • RETROFIT OF A 75 t/h PULVERRIZED COAL BOILER INTO ONE BOILER OF MIXEDLY BURNING PULVERIZED COAL AND COAL GAS

    • Thermal Power Generation   Vol. 40, Issue 4, Pages: 70-73(2011)
    • CLC: TK229.63
    • Published:2011

    移动端阅览

  • CHEN Donglin1, WEN Dazhui1, XU Huifang1, et al. RETROFIT OF A 75 t/h PULVERRIZED COAL BOILER INTO ONE BOILER OF MIXEDLY BURNING PULVERIZED COAL AND COAL GAS[J]. Thermal power generation, 2011, 40(4): 70-73. DOI:

  •  
  •  

0

Views

163

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization of the mode of outlet conditions for opposed spiral firing burners
Numerical simulation of combustion process in a tangentially pulverized-coal-fired boiler under variable load operation
Experimental study on ignition delay characteristics of pulverized coal in flat flame entrained flow reactor system
Calculation method of air preheater leakage rate for boiler mixedly burning pulverized coal and blast furnace gas
Experimental investigation on ignition of low-volatile pulverized coal in a tiny- oil burner under oxygen-enriched conditions

Related Author

LI Xinhao
WANG Chunbo
GUO Yongcheng
ZOU Chan
WANG Qiuhong
WANG Chao
ZHANG Xiaotao
WANG Aijun

Related Institution

School of Energy and Power Engineering, North China Electric Power University
School of Electric Power, North China University of Water Resources and Electric Power
Xinxiang Aviation Industry (Group) Co.,Ltd.
Shandong Electric Power Engineering Consulting Institute Co.,Ltd.
Guizhou Electric Power Test and Research Institute
0