您当前的位置:
首页 >
文章列表页 >
COMMISION DEBUGGING OF MAKE-UP WATER TREATMENT USING LIME FOR CIRCULATING WATER IN ONE THERMAL POWER PLANT
更新时间:2025-09-28
    • COMMISION DEBUGGING OF MAKE-UP WATER TREATMENT USING LIME FOR CIRCULATING WATER IN ONE THERMAL POWER PLANT

    • Thermal Power Generation   Vol. 40, Issue 4, Pages: 81-84(2011)
    • CLC: TM621.8
    • Published:2011

    移动端阅览

  • YUAN Guoquan, YE Zhi'an, YANG Yonggang, et al. COMMISION DEBUGGING OF MAKE-UP WATER TREATMENT USING LIME FOR CIRCULATING WATER IN ONE THERMAL POWER PLANT[J]. Thermal power generation, 2011, 40(4): 81-84. DOI:

  •  
  •  

0

Views

159

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF SLOW SPEED DECARBONIZATION WATER TREATMENT PROCESS IN ASPECT OF WATER-SAVING WITHIN THERMAL POWER PLANT
INFLUENCE OF PHOSPHEROUS ANTISCALANT USED IN RECYCLING UTILIZATION SYSTEM OF BLOW-DOWN WATER FROM CIRCULATING WATER UPON THE COAGULATION EFFECT
AN APPROACH TO CONTROL INDEX OF Cu AND Fe CONTENT IN CIRCULATING WATER OF THERMAL POWER PLANTS
STUDY ON INFLUENCE OF BACTERICIDE IN CIRCULATING WATER UPON THE REVERSE-OSMOSIS MEMBRANE
OPERATION OPTIMIZATION AND ECONOMIC EFFICIENCY DIAGNOSIS ON COLD END SYSTEM OF 300 MW UNIT IN SHAJIAO A POWER PLANT

Related Author

ZHAO Shushan2 1.Xi'an Thermal Power Reserach Institute Co Ltd
XU Zhen1
YUAN Guoquan1
YE Zhi'an1
WU Jing-ran11.College of Environment Science and Engineering
SUN Xin-li2
CHEN Ying-min1
ZHANG Baoshan31.Xi'an Thermal Power Research Institute Co Ltd

Related Institution

Huaneng Dezhou Power Plant
Hebei Electric Power Research Institute
College of Environmental Science and Engineering, North China Electric Power University
Huaneng Shang'an Power Plant
Xi'an Special Equipment Inspection and Testing Institute
0